Description:
|
Construction work, in general, consists of furnishing all labor, materials, equipment, and services for the reconstruction of the following roadway segments:
-
Cantfield Ave between W Perkinsville Rd and end of cul-de-sac (3” AC)
-
Taylor Ave between W Perkinsville Rd and end of cul-de-sac (3” AC)
-
Campbell Ave between W Perkinsville Rd and end of cul-de-sac (3” AC)
-
E Rd 1 South between SR-89 and S Road 1 East (4” AC / 9” AB)
-
S Rd 1 East between Fletcher Ct and E Rd 3 South (4” AC / 9” AB) including new 18” sewer main with appurtenances.
|
Publication Date/Time:
|
3/21/2023 7:00 AM
|
Publication Information:
|
March 21, 22, 23, 24, 2023 Prescott Courier
|
Closing Date/Time:
|
4/11/2023 3:00 PM
|
Submittal Information:
|
Public Works Department, 1982 Voss Dr, Chino Valley, AZ 86323
|
Bid Opening Information:
|
04/11/2023 3:00 PM
|
Pre-bid Meeting:
|
Non-Mandatory, 03/29/2023
|
Contact Person:
|
Steve Sullivan, Assistant Town Engineer: ssullivan@chinoaz.net
|
Download Available:
|
www.chinoaz.net/bids.aspx
|
Related Documents:
|
|
|