Arizona Bids > Bid Detail

S.R. 89 - Pioneer Parkway Microsurface (FY 2019-2020) in Yavapai County, AZ - Project #1619224

Agency: Yavapai County
Level of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
Opps ID: NBD10182065396499780
Posted Date: Jun 10, 2019
Due Date: Jun 27, 2019
Solicitation No: #1619224
Source: http://www.planroomdirect.com/...
S.R. 89 - Pioneer Parkway Microsurface (FY 2019-2020) in Yavapai County, AZ - Project #1619224

AFTER POSTING, WE NOTICED THE BID SCHEDULE IS MISSING KEY INFORMATION AND WAS REVISED AND POSTED ON JUNE 10, 2019. THE ORIGINAL BID SCHEDULE HAS BEEN REMOVED. The scope of work includes the furnishing of all labor, materials, equipment, fixtures and services required for micro-milling of existing ACFC pavement and placement of a dual-layer (Type II and Type III) microsurface at Pioneer Parkway and a dual-layer (Type II and Type III) microsurface on State Route 89 in Prescott, Arizona. The project length for Pioneer Parkway is 2.4 miles and the project length for State Route 89 is 1 miles. Total estimated quantity of area to receive micro-milling is approximately 90,992 square yards. The total estimated quantity for Type III microsurface is approximately 132,227 yards and Type II is approximately 90,404 square yards. Other associated works include 2,442 gallons of fog seal coat at Pioneer Parkway and associated roadway striping at both locations. All work is to be done in accordance with the plans, specifications, and contract documents. There has been a MANDATORY pre-bid meeting scheduled for 10:00 a.m., Tuesday, June 18, 2019, in the Yavapai County Public Works Department Conference Room B, 1100 Commerce Drive, Prescott, AZ 86305. Any questions or concerns about the project will be addressed at that time. ENGINEER'S ESTIMATE: $651,100.00

Project Files
Part A - Project Documents
Part B - Project Plan Sheets
Part C - Bidding Documents
Envelope #1 - This sealed envelope shall contain the following items: Completed and signed Proposal, Surety Bid Bond, Affidavit of Non-collusion, Subcontracting Certification, Addenda (if any), and sealed Envelope #2.
C.1 - Contract Documents
Required documents to be completed and signed.
C.2 - Addenda
There are no addenda as of 6/4/19
C.3 - Envelope #2
Required document to be completed and signed.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >