Description:
|
The Work included in this Project consists of three parts including the removal of the existing asphalt pavement section, installation of phased asphalt and aggregate base, installation of 12” Class 350 Ductile Iron Water line, installation of 18” PVC sewer, and the installation of curb, gutter, and sidewalk along W. Perkinsville Rd Starting at AZ 89 and extending East to N Road 1 E. The Town is issuing this IFB to secure a qualified Engineering Contracting (Commercial) Class A Licensed Contractor to perform the Work and provide Materials as more particularly described in the Specifications attached hereto as Exhibit A, and incorporated herein by reference. Bidders must submit Bids encompassing the entire Project, inclusive of the related Plans, Specifications, related construction drawings and Reference Documents, if any. Failure to do so may result in a determination that the Bid is non-responsive.
|
Publication Date/Time:
|
1/16/2024 7:00 AM
|
Publication Information:
|
Prescott Daily Courier January 16, 17, 18, 19 - 2024
|
Closing Date/Time:
|
2/22/2024 3:00 PM
|
Submittal Information:
|
Town Hall, 202 N State Route 89, Chino Valley, AZ 86323
|
Bid Opening Information:
|
02/22/2024 3:00pm
|
Pre-bid Meeting:
|
Non-Mandatory, 01/31/2024
|
Contact Person:
|
Steven Sullivan, Assistant Town Engineer
ssullivan@chinoaz.net
928-636-3402
|
Download Available:
|
www.chinoaz.net/bids.aspx
|
Miscellaneous:
|
Non-Mandatory Pre-Bid meeting to be held both in-person and online. Please see documents for Zoom meeting detail.
|
Related Documents:
|
|
|