Prescott East Highway Reconstruction Project in Yavapai County, Arizona - Project #1722058

Agency: Yavapai County
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD18732791215529756
Posted Date: Feb 27, 2023
Due Date:
Source: https://yavapaiaz.gov/bids/pub...
Prescott East Highway Reconstruction Project in Yavapai County, Arizona - Project #1722058

Sealed bids will be received by the Board of Supervisors of Yavapai County, in the office of the Clerk of the Board of Supervisors, Room 310, Yavapai County Administrative Services Building, 1015 Fair Street, Prescott, Arizona until 1:30 p.m. (by the official clock located in the office of the Clerk of the Board of Supervisors), Thursday, September 8, 2022, for PRESCOTT EAST HIGHWAY RECONSTRUCTION PROJECT IN YAVAPAI COUNTY, AZ - PROJECT #1722058. No bids will be accepted after 1:30 p.m. The bids will be publicly opened and read aloud at 2:00 p.m. on Thursday, September 8, 2022.

The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for improvement of Prescott East Highway (PEH) from State Route 69 to Antelope Lane:

    1. State Route 69 to Copper Hill Drive
      1. Remove existing asphaltic concrete by mill up to a depth of 4” and pave the roadway with 4” new asphaltic concrete (AC).
      2. Widen PEH from Frontage Road to Copper Hill Drive for the addition of northbound right-turn lane at Copper Hill Drive intersection. The added pavement shall have a structural section of 6” new AC and 8” new aggregate base (AB) with a single layer of geogrid.
      3. Construct new concrete sidewalk with new curb and gutter.
    2. Copper Hill Drive to Sunset Lane
      1. Pulverize existing pavement up to a depth of 9”. Grade FDR base in-place per design plan prior to cement treatment.
      2. Construct new 6 feet wide concrete median and install concrete roundabouts at 3 locations.
      3. Install 2” new AB and 5” new AC over cement treated FDR base.
      4. Widening northbound approach of PEH at Sunset Lane intersection to add dedicated left and right turn lanes.
    3. Sunset Lane to Antelope Lane
      1. Pulverize existing pavement up to a depth of 9”. Grade FDR base in-place per design plan prior to cement treatment.
      2. Reconfigure PEH median near Sunset Lane intersection to add a southbound left-turn lane.
      3. Reconfigure PEH median at 2 locations to accommodate the installation of 2 roundabouts. Remove and reinstall single curb along remaining median.
      4. Install 2” new aggregate base over cement treated FDR base, and finish paving with 5” of new asphaltic concrete.

Other associated work includes mailboxes relocation, striping and signage reestablishment, culvert installation and catch basin installation. Temporary erosion prevention with wattles shall be implemented during construction. All work is to be done in accordance with the plans, specifications, and contract documents.

There has been a MANDATORY pre-bid meeting scheduled for 10:00 a.m., Tuesday, August 30, 2022, hosted by Yavapai County Public Works through an online virtual meeting portal. Detailed meeting instructions will be included in the contract documents. Any questions or concerns about the project will be addressed at that time.

ENGINEER'S ESTIMATE $4,482,610.00

Date Posted: 08/09/2022 17:01
Closing Date: 9/8/2022
Last Modified: 09/08/2022 16:39
Project Files
BID TAB - Prescott East Highway Reconstruction 1722058
Bid Opening Results 1722058
Sign-In Sheet for Mandatory Pre-Bid Meeting 1722058
Part A - Project Documents
Instructions for Bidding 1722058
Instructions for Mandatory Pre-Bid Meeting 1722058
Project Provisions and Specifications 1722058
Part B - Project Plansheets
Prescott East Highway Reconstruction Project Planset - Revised September 6, 2022 - 1722058
Part C - Bidding Documents
Envelope #1 - This sealed envelope shall contain the following items: Completed and signed Proposal, Surety Bid Bond, Affidavit of Non-collusion, Subcontracting Certification, Addenda (if any), and sealed Envelope #2.
C.1 - Contract Documents
Required documents to be completed and signed.
Proposal 1722058
Surety Bid Bond 1722058
Affidavit of No Collusion 1722058
Subcontracting Certification 1722058
C.2 - Addenda
Addendum 1 - 1722058
C.3 - Envelope #2
Required document to be completed and signed.
Bid Schedule - Revised September 6, 2022 - 1722058

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >